The original Shanghai railway station was built in 1908. It used to becalled the North Railway Station (North Station), which is located at Baoshanintersection of Tianmu middle road.
Shanghai north railway station is one of the hubs connecting the landnorth-south transportation lines in China. From Shanghai north station, alongthe Huning line, you can connect Jinpu, Longhai and other lines to Hefei,Tianjin, Beijing, Xi'an, Urumqi, Yuyang, Changchun, Harbin and other places;from Shanghai Hangzhou line, you can connect Zhejiang Jiangxi and other lines toNanchang, Fuzhou, Xiamen, Guangzhou, Kunming, Guiyang, Chengdu, Chongqing andother places. Every day, you can arrive at nearly 50 trains, which areresponsible for the national travel 14.3% of the passenger volume.
The original construction area of Shanghai railway station was only 20__square meters. After the "1028" and "8013" incidents, it was destroyed by thewar. Although it was built several times, its operation capacity was limited. Inorder to improve the transportation conditions, the Shanghai municipalauthorities decided to officially start the construction of a new passengerstation on September 20, 1984.
The new railway station is a large-scale comprehensive construction projectin Shanghai in the 1980s. It was officially opened on December 28, 1987. Thedesign capacity of the new passenger station is 72 pairs. The designed passengerthroughput of the station square in full day and peak hours is 575000 and 50000respectively, and the vehicle throughput is 33000 and 3000 respectively.According to the passenger flow, vehicle throughput and land use conditions, thenorth and South squares of the new station are determined. The planning area ofthe square is 97000 square meters, including 67000 square meters for the SouthSquare, 30000 square meters for the North Square, and 10000 square meters forpedestrians, 7200 square meters for vehicles and 12800 square meters forparking. Passengers can take the bus nearby, reducing detours and improving theriding conditions. At the same time, it intersects with Metro Line 1 and therail transit "Pearl Line" under construction to form an efficient passenger flowdistribution center.
The south square consists of a central square and two auxiliary squares,which are arranged symmetrically. The pedestrian belt in front of the East-Westexit hall extends forward and encircles the central parking lot in the shape ofcrab pincers. A green island is arranged in the middle, opposite to the gate ofthe main building of the station building, which becomes the center of the wholesquare. The terminal stations of bus lines are scattered in front of theEast-West exit hall. North Square uses the North-South kongjiamuqiao road andthe east-west traffic road as the main access roads to the station. The northside of the exit hall and the East and West wings of the entrance hall of thesquare are respectively arranged with motor vehicle parking lots. A number oftraffic terminals are set near the entrance hall, and non motor vehicle parkingplaces are set at the East and West ends of the square.
因篇幅问题不能全部显示,请点此查看更多更全内容